Customization of products through mold opening

This section introduces the process of customizing products that require the production of molds。If the customer has their own design or special requirements for the product, we are more than happy to assist in the design and provide mold making services at the same time.

drawing design

We'll design 3D drawings based on the samples or pictures provided by the customer and send them to the customer for confirmation.this part may need 5-7days.

prototype making

After confirming the drawings, We can make prototype samples based on the drawings and provide them to the customer to confirm if further adjustments are needed.this part may need 5-7 days.

mould making

After confirming all the above, we start making the mold.this part may need 40 days.

sample making

After the mold production is completed, we provide real samples to the customer for confirmation.this part may need 5-7 days.

bulk production

After sample confirmation, we accept the order and proceed with bulk production.our lead time for one 40HQ container products is about 30 days.